A TSBC-ready QCP manual in 72 hours, at a flat price.
Submission-ready Quality Control Program manuals for BC refrigeration (Class REF) and boiler (Class B) contractors, written to Technical Safety BC guideline BRC-7031-03, specific to your company. Accepted by TSBC, or we revise it free until it is.
Three steps. No technical writing.
You answer a short form in plain language. We write the manual. You submit it and renew.
Answer a 20-minute intake
Your licence number, your people, your scope, your logo. No jargon required, “N/A” and “not sure” are perfectly good answers. We turn it into the right wording.
Get a full draft in 72 hours
All 17 sections, your branded exhibit forms, your org chart, a signing-ready Statement of Authority, and the pre-filled Appendix B submission checklist, reviewed by a specialist before it reaches you.
Submit & renew with confidence
You get a one-page how-to-submit sheet. If TSBC requests changes that come from our drafting, we revise it free until it’s accepted.
Company-specific and submission-ready
Not a blank template, a complete manual that reflects how your shop actually runs, with everything TSBC asks you to submit.
- 17-section QCP manual built to BRC-7031-03 (typically 40 to 60 pages)
- Branded exhibit forms: material receiving, pressure test, NCR, ITP, calibration log, and more
- Pre-filled Appendix B element checklist with page references, the table TSBC asks you to submit
- Revision-control system set up (TSBC requires annual review of every manual)
- An Operations Accuracy Attestation, so your manual matches how your shop really works
- Optional mock-up demonstration package for new applications
Compliance documents, done properly.
GetQCPManual is a dedicated Quality Control Program service for BC trades contractors. We built it for the gap between a $499 template that gets rejected and a $150-an-hour consultant who takes weeks. Neither is fair when you simply need an accepted manual before your renewal.
Every manual is written to Technical Safety BC’s published guideline, made specific to your operation, and reviewed against our production standard before it reaches you. If TSBC requests changes that come from our drafting, we revise them free until it is accepted. Questions before you start? Email rylan@getqcpmanual.ca.
“A QCP manual isn’t marketing copy. It’s paperwork you file with a regulator and then follow every day. That’s why nothing is auto-sent, the price is flat, and the timeline is fixed. You know exactly what you’re paying and exactly when it lands.”
Flat price. You know the number up front.
Pay a 50% deposit to start; the balance is invoiced on delivery. Every manual is backed by our acceptance commitment.
BC Class REF QCP
Refrigeration / HVAC contractors (TSBC Class REF licence)
- Full 17-section manual to BRC-7031-03
- Branded forms + Appendix B checklist
- Draft in 72 hours
- Accepted by TSBC or revised free
Accepted by TSBC or revised free until it is.
BC Class B QCP
Boiler / heating contractors (TSBC Class B licence)
- Full 17-section manual, Class B boiler scope
- Branded forms + Appendix B checklist
- Draft in 72 hours
- Accepted by TSBC or revised free
Accepted by TSBC or revised free until it is.
Annual QCP Review
Keep an existing manual current and renewal-ready
- Annual review and update of your manual
- Keeps revision control current
- Ready before each licence renewal
- Cancel anytime
Other classes & provinces? Get a quote.
Templates get rejected. Company-specific manuals get accepted.
TSBC’s own free sample is a skeleton, sections 7 through 16 literally say “include requirements per Appendix A & B.” The content has to be your scope, your titles, your forms with your licence number. Generic templates are the #1 rejection reason.
A consultant gets there in 3 to 6 weeks at $150-200/hr. We deliver in 72 hours at a flat price, because these manuals are all we do.
- Specific to your company, not a fill-in-the-blanks shell
- Written to the regulator’s published spec (BRC-7031-03)
- Specialist-reviewed before it reaches you, nothing is auto-sent
- Flat price, fixed timeline, no hourly billing surprises
Regulator-sourced. Specialist-reviewed. Backed by a written commitment.
A compliance manual is paperwork you file with a regulator, so accuracy is everything. Here’s how we earn the trust to write yours.
Built from the regulator’s own spec
Every manual follows TSBC guideline BRC-7031-03 and submits the exact Appendix B element checklist TSBC asks for, not a guess at what they want.
A specialist reviews every manual
Nothing is auto-sent. Every draft is reviewed before it reaches you, and ships with an Operations Accuracy Attestation you sign so it reflects how your shop actually runs.
Acceptance commitment in writing
If TSBC requests changes that come from our drafting, we revise the manual free until it’s accepted, or refund it, per our Services Agreement.
Quick answers before you start
Do I really need a QCP manual now?
If you hold or are applying for a TSBC Class REF or Class B contractor licence, yes, an accepted QCP manual is required at application and renewal as of January 1, 2026. The transition pass only defers it to your next renewal.
What if TSBC asks for changes?
If the changes come from our drafting, we revise the manual free until it’s accepted. Full terms are in our Services Agreement.
How does payment work?
You pay a 50% deposit through Stripe’s secure checkout to start. That takes you straight to your intake form, your 72-hour clock starts, and we invoice the balance on delivery.
I’m not a technical writer, can I still do the intake?
Yes. The form is plain-language and takes about 20 minutes. “Not sure” and “N/A” are fine answers, we turn your plain words into the correct manual.
Understand the QCP requirement before you buy
Plain-English guides on the TSBC Quality Control Program, written from the regulator's own spec.
Refer one contractor, get your next year free
After your first referral, earn $500 for every Class REF referral and $400 for every Class B referral that buys. No cap.
See the referral programReady to get your renewal-ready QCP manual?
Start the intake, pay a 50% deposit, and have a submission-ready draft in 72 hours, accepted by TSBC or revised free.